Courtyard by Marriott: Corvallis

NWCB Project of the Year:  Light Gauge Cold Formed Steel Framing – Oregon

Completed: 2017

This project was built in partnership with A&A Project Development and Jensen Fey Architects. This Marriott is a 7-story, “4-over-3” project where Harver built 4 floors of prefabricated structural panels on the 3 story post-tension concrete podium. After being awarded this project late into construction, the Harver design-assist team quickly designed the structural panels and began fabricating panels within 2 months.  Complicated sections of the joists and parapet sections were also pre-fabricated onsite and flown into place.  Seamless panel and joist installation was completed 1 month ahead of schedule during one of the wettest winters on record.  This allowed roofing and other trades the much-needed extra time for dry-in.  With success amidst the high-paced and challenging dynamic that structural panel projects can possess, the Harver Company team demonstrated why it will continue to distinguish itself as a top performer in the walls and ceilings industry.

Project Scope:

  • Design-Assist and Shop Drawings for Pre-fab Structure
  • Prefabricated Structural Wall Panels w/ Exterior Sheathing Pre-Installed
  • Stick Framed and Prefabricated Joist System
  • Verco Pan-Decking
  • Install of Integrated Structural Non-Gauge Steel and Welding
  • Interior Framing of All Amenity Spaces and Over 170 Guestrooms
  • Interior and Exterior Radius Soffit Framing
  • Drywall and Level 5 Finishes on All Floors
  • Suspended Acoustic Ceilings